The conspiracy theorists were right… Jews ARE building space lasers. Except instead of incinerating California, or beaming thoughts into our brains, or whatever else your QAnon uncle may claim — two Jewish founders in Culver City are trying to beam data into space. Right now, most data traveling between continents moves through enormous cables laid across the ocean floor. These (easily damaged) cables are expensive to maintain and limit where data centers can be built, since they need access to fiber connections. So Endeavor Optical Networks, led by Jewish founders Charlie Horowitz and Tyler Presser (@presser_tyler), are on a mission to change that… by building satellites that can beam data around the world using lasers instead, potentially allowing data centers to be built in remote places with cheap land and abundant electricity (rather than in your backyard). One problem the company’s working to overcome? Clouds getting in the way of those lasers. As Presser tells us: “If only we could sync up with some of the Jews who run the weather.” Full story on the company validating the most unhinged internet conspiracies… while working to make the internet run more efficiently @nicolewizman1 👇

250 47 26684 18 14
Ryan McEntush @rmcentush 2026-11-23T17:19:42.000Z

google is right https://t.co/epL5InxJvE

@Stphn_Lacey

There’s a growing amount of excitement and trepidation around off-grid data centers. I’m not convinced many will actually go fully off-grid -- probably as a bridge in most cases. But it’s surfacing a more interesting tension about how we build the system. As @ceboudreau detailed, that tension played out on stage at CERAWeek between Fermi and Google. Fermi is leaning into the “power island” model that pairs data centers with dedicated generation, starting with gas and potentially nuclear. The idea is to move faster, avoid interconnection bottlenecks, and not push costs onto the broader system. Google pushed back on that framing. Their view is that once you start building isolated systems, you end up overbuilding for reliability and tie up more capital into assets that run a fraction of the time. And none of that investment actually improves the grid. There’s also a concern that it could lead to higher system costs over time if those resources aren’t shared. We will clearly see some version of both of these approaches, but I agree more with Google's @AmandaCorio on this one: “We are focusing too narrowly on this moment and the bottlenecks, and not thinking collectively as a system in 10 years."

63 3 3760 4 0
Ryan McEntush @rmcentush 2026-11-23T05:25:41.000Z

“space” is such a cold and empty word to describe most of the universe, and certainly as a pitch to explore it. “greenlanders” had the right idea with naming! “Older thinkers had been wiser when they named it simply the heavens” - CS Lewis

33 1 2318 4 0
Kumar🇺🇸 @datarade 2026-11-23T02:23:59.000Z

Ryan's a good follow. I disagree here. tldr ----FERC can move the needle, just not any of the needles that are actually bottlenecking data center deployments.... Be worried. I was a heavy holder and seller of $POWL - b/c I didn't see data center or silicon valley people taking the time to learn how grid dynamics actually work. some of my notes as discussion.... Data Centers timelines/ratepayer costs aren't chosen by FERC. State rate cases +utility capex plans = the driver. Investor Owned utilities earn a return on rate base. A GW-scale campus is the best capex story utilities have had in 40 years. "DCs pay for their upgrades"= battles that. CIAC earns nothing. (CIAC stands for Contribution in Aid of Construction. In simple terms, it is money or property a customer, developer, or government gives to a utility to help pay for building new infrastructure to serve them.) Load studies do not stall at the ISO. They stall at the Transmission owner.... think facilities studies, transformer lead times, protection engineers....etc. 90-day FERC clock cycles != a fix to a 3 year GSU(generator step-up transformer). ERCOT answers to PUCT. Southeast is vertically integrated with no RTO. Georgia/Carolinas...IRP is the game.

@rmcentush

Lots going on in energy! TL;DR: I'm optimistic and everything will be fine. Last week, every major grid operator answered FERC on large loads and they all roughly point in the same direction. DCs that can “flex” will get connected first. PJM, MISO, NE, and NY all proposed some version of “non-firm” service, where you get on the grid sooner if you accept curtailment when prices spike and/or the system gets tight. DCs will also pay for the upgrades they cause. Much of this (and more) is in the permitting bill that passed the Senate last week. As part of this, I expect designs to push toward DCs that stay grid-connected but carry their own gen & batteries on site. The batteries let a campus ride through faults instead of tripping offline (PJM already proposed making ride-through mandatory so one fault doesn’t cascade into a big load drop). I suspect they’ll also be "encouraged" to provide grid-forming support that steadies voltage, freq, etc. nearby, so a big load = an asset to the grid operator. Additionally, queues will shrink as study fees & collateral reqs flush out more speculative projects. In Texas, TCEQ started issuing permits again after a ~2 mo freeze, and SpaceX was first out the door. However, this is purely temporary BTM & new grid connections are still on hold until ERCOT finishes its audit in Dec. Incoming Gov. Hinojosa has promised a data center moratorium until the legislature passes new protections, but her asks on power & water are generally aligned with what “good” DC developers have already proposed or are doing. Chiefly, no water or power cost increases for local communities. Tax breaks and union labor will be the real negotiation, but, cautiously, I expect they'll find an agreement here given what's at stake. All of this is to say, I think we are reaching some sort of consensus and I’m increasingly more positive on DC buildout in the USA. We had a surge of activity and it took time for institutions to catch up, but I think we’re close to a good place that can handle it, while also refurbishing & growing our industrial base. Candidly, what will be important going forward is that industry leaders (Google, Meta, Ant, OAI, Crusoe, SpaceXAI, etc.) don't give politicians a reason to fight them over something relatively unimportant, like tax breaks or NDAs. There's also greater national issues around transmission (much needed, and often an inter-state issue) and supply chain policy that I think we should see coalitions form around. IMO, these will be the important focus areas as vertical integration and broader scale continue to grow. Disagree? lmk why

13 3 2166 4 0
Ryan McEntush @rmcentush 2026-11-22T20:30:56.000Z

Lots going on in energy! TL;DR: I'm optimistic and everything will be fine. Last week, every major grid operator answered FERC on large loads and they all roughly point in the same direction. DCs that can “flex” will get connected first. PJM, MISO, NE, and NY all proposed some version of “non-firm” service, where you get on the grid sooner if you accept curtailment when prices spike and/or the system gets tight. DCs will also pay for the upgrades they cause. Much of this (and more) is in the permitting bill that passed the Senate last week. As part of this, I expect designs to push toward DCs that stay grid-connected but carry their own gen & batteries on site. The batteries let a campus ride through faults instead of tripping offline (PJM already proposed making ride-through mandatory so one fault doesn’t cascade into a big load drop). I suspect they’ll also be "encouraged" to provide grid-forming support that steadies voltage, freq, etc. nearby, so a big load = an asset to the grid operator. Additionally, queues will shrink as study fees & collateral reqs flush out more speculative projects. In Texas, TCEQ started issuing permits again after a ~2 mo freeze, and SpaceX was first out the door. However, this is purely temporary BTM & new grid connections are still on hold until ERCOT finishes its audit in Dec. Incoming Gov. Hinojosa has promised a data center moratorium until the legislature passes new protections, but her asks on power & water are generally aligned with what “good” DC developers have already proposed or are doing. Chiefly, no water or power cost increases for local communities. Tax breaks and union labor will be the real negotiation, but, cautiously, I expect they'll find an agreement here given what's at stake. All of this is to say, I think we are reaching some sort of consensus and I’m increasingly more positive on DC buildout in the USA. We had a surge of activity and it took time for institutions to catch up, but I think we’re close to a good place that can handle it, while also refurbishing & growing our industrial base. Candidly, what will be important going forward is that industry leaders (Google, Meta, Ant, OAI, Crusoe, SpaceXAI, etc.) don't give politicians a reason to fight them over something relatively unimportant, like tax breaks or NDAs. There's also greater national issues around transmission (much needed, and often an inter-state issue) and supply chain policy that I think we should see coalitions form around. IMO, these will be the important focus areas as vertical integration and broader scale continue to grow. Disagree? lmk why

164 6 21659 27 5
Object Zero @Object_Zero_ 2026-11-22T22:02:43.000Z

It should definitely improve, but have heard horror stories of FERC blocking DC projects even when all parties on the deal are willing. Also DC is act 1. I guess America needs 80-100GW of DC but then need another 1-200GW for robots Power demand for intelligent machines that can operate profitably is basically unlimited. Question is really: what is the marginal intelligent machine, in a given future year? I think AI means that GDP uncouples from demographics, and just perpetually bids the grid for more power.

4 0 148 1 0
Ryan McEntush @rmcentush 2026-11-22T22:09:04.000Z

Yep. I think DCs are the easiest version of future load growth issues, and why we should be doing everything we can to let them pay for much needed upgrades in return for faster connection. They'll site anywhere and are not concerned with price — this is not true of basically any other customer. How the grid handles broader re-industrialization, robots, EVs, etc. will be much more challenging. Such customers are necessarily in densely populated areas, price sensitive, and likely require much broader upgrades across the entire grid to manage firm service.

2 0 79 0 0
Object Zero @Object_Zero_ 2026-11-22T21:50:16.000Z

Between 2000 and 2020 some 13% by capacity, of projects in the grid connection queue actually get connected. Median wait time last year was 61 months. 61 months from today is 22 December 2032. Connections by technology type… 17% of gas projects 15% of wind projects 10% of solar projects 8% of BESS projects The supply chain will promise the same 1x turbine to maybe 7 or 8 different projects. The queue isn’t real, it’s a sort of financial fiction. The supply chain’s delivery capacity is real.

12 0 1188 1 0
Ryan McEntush @rmcentush 2026-11-22T21:54:24.000Z

Yep, suspect new que reqs, batch cycles, milestones for larger loads, etc. all help mitigate this, but will never be perfect. Obv status quo is untenable and I dont blame them for auditing it. In theory, cost allocation (major bottleneck) does get easier if datacenters agree to pay for everything, assuming that’s possible. Still trying to wrap my head around where this is headed

3 0 242 1 0
@rmcentush reposted
Tyler Norris @tylerhnorris 2026-11-22T21:49:46.000Z

Well-designed flexible interconnection options can keep more data centers on the grid, reduce emissions from off-grid data centers, preserve grid headroom for other customers, and make better use of grid infrastructure in a way that puts downward pressure on electricity rates. Thx @rmcentush for highlighting these important FERC proceedings - for those interested, the clearest explainer I’ve seen is a report our team commissioned by @TheBrattleGroup (Sept 2025), “Solutions for Timely Interconnection of Large Loads: Enabling Non-Firm Transmission Service”: https://www.brattle.com/insights-events/publications/new-brattle-report-explores-solutions-for-timely-interconnection-of-large-loads/

@rmcentush

Lots going on in energy! TL;DR: I'm optimistic and everything will be fine. Last week, every major grid operator answered FERC on large loads and they all roughly point in the same direction. DCs that can “flex” will get connected first. PJM, MISO, NE, and NY all proposed some version of “non-firm” service, where you get on the grid sooner if you accept curtailment when prices spike and/or the system gets tight. DCs will also pay for the upgrades they cause. Much of this (and more) is in the permitting bill that passed the Senate last week. As part of this, I expect designs to push toward DCs that stay grid-connected but carry their own gen & batteries on site. The batteries let a campus ride through faults instead of tripping offline (PJM already proposed making ride-through mandatory so one fault doesn’t cascade into a big load drop). I suspect they’ll also be "encouraged" to provide grid-forming support that steadies voltage, freq, etc. nearby, so a big load = an asset to the grid operator. Additionally, queues will shrink as study fees & collateral reqs flush out more speculative projects. In Texas, TCEQ started issuing permits again after a ~2 mo freeze, and SpaceX was first out the door. However, this is purely temporary BTM & new grid connections are still on hold until ERCOT finishes its audit in Dec. Incoming Gov. Hinojosa has promised a data center moratorium until the legislature passes new protections, but her asks on power & water are generally aligned with what “good” DC developers have already proposed or are doing. Chiefly, no water or power cost increases for local communities. Tax breaks and union labor will be the real negotiation, but, cautiously, I expect they'll find an agreement here given what's at stake. All of this is to say, I think we are reaching some sort of consensus and I’m increasingly more positive on DC buildout in the USA. We had a surge of activity and it took time for institutions to catch up, but I think we’re close to a good place that can handle it, while also refurbishing & growing our industrial base. Candidly, what will be important going forward is that industry leaders (Google, Meta, Ant, OAI, Crusoe, SpaceXAI, etc.) don't give politicians a reason to fight them over something relatively unimportant, like tax breaks or NDAs. There's also greater national issues around transmission (much needed, and often an inter-state issue) and supply chain policy that I think we should see coalitions form around. IMO, these will be the important focus areas as vertical integration and broader scale continue to grow. Disagree? lmk why

40 5 3788 9 0
InfraMarginal @infra_marginal 2026-11-22T21:27:50.000Z

@rmcentush Directionally right, but "flex" isn't free. Load curtailment mostly lands when the system's tight, exactly when on-site gen/storage is worth the most to the DC. The DC is short that option, so who prices it: the ISO, the DC, or the lender sizing debt against it?

5 0 335 1 0
Jared Chalk @JaredChalkUSA 2026-11-22T20:38:01.000Z

@rmcentush LBNL counts over 2,060 GW of generation and storage waiting in US interconnection queues at end of 2025. Flex service gets data centers connected sooner, sure. Transformers and line crews still come from the same pool shipyards and munitions plants pull from.

4 0 203 1 0