TMI π Repairs to stabilize it near the shore with 300 large boulders after it was closed in June 2026, due to severe concrete cracking, shifting, and damage near the abutment. Power Engineering Construction Co. assembled two 400-ton cranes, drove piles, welded north and south piles, and installed temporary pile-and-beam shoring and a King Pile COMBI wall near the landward end too.
Full repairs were in the $19-20 million range and so far only $2 million in state stabilization funding was announced in November 2026, the city was still deciding between rebuilding, demolishing it, or pursuing managed retreat. There was no current date or plan to reopen it. Sad to see the piers up and down the coast being destroyed.