IAF Compromised its Entire Fleet Modernisation just for “Indigenisation” and “Atmanirbharta” giving Endless opportunities to D P S Us that have time and again Failed to meet the Standard Requirements. IAF gave 53 Concessions to H A L on Tejas project and often people Accuse IAF of Constantly Changing ASQR has been negated by CAG. Only ASQR changes were made regarding the Weapons Parameters to meet futuristic Requirements. Even if the Argument is Considered that Even Changes in ASQR regarding the Weapons Parameters were made then only limited Changes in Avionics, Radar and EW were to be made and that’s no point to make sufficient claims that IAF made Humongous changes in ASQR.
IAF should have been Ruthless just like Navy, the way Navy Rejected Naval Version of Tejas and didn’t give importance to TEDBF given the fact that Naval Leadership Realised that these
H A L and D R D O aren’t able to manufacture and produce basic 4th Gen Single Engine for IAF, manufacturing and producing carrier based fighter jets for Navy Requires immense Specialisation and they surely can’t meet the Standards of Naval Carrier based Fighters. The Navy gave impetus to modernisation of its Naval Aviation Operational Fleet and not Compromising with its Standards Requirements.
@mountain_ratsWas the IAF asking for too much with LCA/Tejas back in 80's ?
The IAF's October 1985 Air Staff Requirement envisaged:
200 fighter aircraft and 20 trainers.
A lightweight, multi-role fighter.
Modern air-combat and ground-attack capabilities.
Excellent manoeuvrability.
Extended air-defence capability.
The planned induction date was 1994.
Were these requirements unreasonable?
Not necessarily!
The IAF needed a credible replacement for its MiG-21 fleet. It could not design its requirements around what Indian industry happened to know how to manufacture.