I know Ugur is assuming $350mm revenue below which seems impossible at the moment.
But, I believe it was in the Q2 call that Joe said getting to the top end of guidance would require getting all 4 shifts on Line 2 operating by the end of the year.
Yesterday we were told Line 2 is running 24 hours a day. I still don't know if that means 2 shifts [A+C] or 4 shifts [A+B+C+D].
If the company is at 4 shifts as of yesterday, Ugur's math might just come into play!
@ugusek1$EOSE
If Eos closes the year at $350M revenue, the unit economics get very interesting.
Q4 would need ~$142M, at ~670 MWh.
Revenue per kWh: $212 (ASP, the lowest recent print) + $45 (45X tax credit) + $3 (ETC, electrolyte tax credit) = $260/kWh
COGS per kWh: ~$255 (my estimate: COGS needed to hit (15%) adj. GM at that volume)
$260 vs $255 → crossing breakeven on a per-unit basis, and getting very close to contribution-margin positive.
If not Q4, then Q1. This is done !!! , done !!!.
All Q4 figures are my own estimates, not company guidance. Company guides FY'26 to the lower half of $300–350M. ASP held flat at $212; tax credit treatment assumed.